Product Specs for:
Celbar® Spray-On Systems
|
 |
|
|
Metal Stud Assemblies |
STC Rating |
|
Construction
Detail |
55 |
|
2-1/2" metal studs, 2 layers 5/8" gypsum board on one side, 1
layer
5/8" gypsum board on the opposite side:
2-1/2" Celbar Spray |
53 |
|
3-5/8" metal studs, 1 layer 5/8" gypsum board on each side:
2" Celbar Spray |
51 |
|
2-1/2" metal stud 24" O.C. faced both sides with 5/8"
gypsum wallboard: 1-1/2" Celbar Spray |
|
|
|
Wood Assemblies |
STC Rating |
|
Construction
Detail |
58 |
|
2" x 4" stud on a 2" x 6" plate spaced 16" O.C. and staggered on
opposite sides, faced on both sides with 5/" gypsum wallboard:
1-1/2" Celbar Spray |
56 |
|
2" x 4" stud 16" O.C. on two separate 2" x 4" plates with 1"
separation. Faced on one side with 5/8" gypsum wallboard and
1/2" gypsum wallboard other side:
1-1/2" Celbar Spray |
51 |
|
2" x 4" wood studs, 1 layer 5/8" gypsum board on each side:
3-1/2" Celbar Spray |
50 |
|
2" x 4" wood studs, 1 layer 5/8" gypsum board on each side:
2" Celbar Spray |
|
|
Celbar® Approvals and Ratings
Physical Properties
|
Thermal Properties
R-Values 3.8/inch |
Thickness
R-Value |
1.0"
3.8 |
2.5"
9.5 |
3.5"
13.3 |
|
|
Fire Hazard Classification
Underwriters Laboratories
Reference #R-5499 |
|
Listings
ICBO - Approval Number 2262
Southern Building Code - Approval Number 9566
HUD-FHA-VA-Permits the use of Celbar in projects
they finance - based on Celbar's compliance with
UMB-80 |
|
ASTM E-119 Fire Rating - One Hour
Celbar has been tested in accordance with ASTM E-119
including hose stream test and is accepted for use in fire-rated wall
assemblies as a one hour wall. |
|
Celbar® Uses:
Party Walls
Exterior Walls |
|
Around baths
Corridor Walls |
|
Plumbing chases
Between Floors |
|
|
Typical Structures:
Homes
Condominiums
Townhouses |
|
Hotels/Motels
Apartments
Shopping Malls |
|
Theaters
Restaurants
Office Buildings |
|